Customized Size 34 40 60 80 100mm Recycling Industry Shredder Rotary Blade
1. Blanking Selecting material according the customers' request.
2. Forging Increasing the density of the material.
3. Tempering Lowering temperature for processing.
4. Finishing machining Making the material shaped
5. Inspection Checking the products if they are the same as the drawing.
6. Hardening Increasing the hardness of products and the material.
7. Annealing To incrase abrasion resistance, need to anneal thermal insulation for long time.
8. Hardening and tempering Hardening and tempering the parallel of products for processing.
9. Coarse grinding Coarse grinding the surface of products to be shaped.
10. Accurate grinding Supergrinding to incrase the precision and the parallel of products.
11. Testing Refusing the unqualified products into the market.
12. Packaging Different products, different packaging
Specifications:
Size | 34*34,40*40, 50*50,60*60 ,80*80mm or customized |
Material | D2 1.2379, high alloy tool steel |
Hardness | 58-60 HRC |
Tolerance | Exceed OEM specification |
OEM Service | Available |
Packing | Wooden boxes, standard export packaging |
Application | Shredder blades for Plastic, Rubber, Metal, Waste Recycling |
Delivery time | 30 days after deposit be received |
FAQ:
1. Q: How do we know that you are a manufacturer under this special period?
A: We can make a video call any time to show you our actual factory.
2. Q: Can I get a special design for my products?
A: We have our R&D department offering customization services for our customers.
3. Q: Are you a factory or a trading company?
A: We are a professional factory who gets 20+ years of professional experience
4. Q: How long is your delivery time?
A: 1 set for normal standard machine needs about 3-7 working days. For 1 or more containers, needs about 20-30 working days.
5. Q: How long is your warranty?
A: Within 1 year from the date of the factory, if parts are a failure or are damaged the cause of a quality problem (except wearing parts), we provide these parts for free.
6. Q: What is your payment term?
A: T/T 100% before shipment, L/C at sight, western union or Trade Assurance order recommended.